More tenants announced for new mall
The developer behind one of Tsawwassen First Nation’s massive mall projects has announced some of the stores and restaurants that will open when the centre opens on Oct. 5.
Ivanhoe Cambridge satiated Lower Mainland shoppers’ curiosity about Tsawwassen Mills with a list of 25 stores and two restaurants that have signed on as tenants.
Until now, there have been just two previous announcements that Bass Pro Shops and high-end Saks Off Fifth will be tenants. The 1.2 million square foot centre is currently under construction and is expected to open its doors this fall. Newly announced tenants will include a Nike Factory Store, H&M, Winners, Old Navy and Sport Chek as well as the restaurants Milestones and Montana’s.
The developer calls the announcement a “small dent” in its full roster of about 200. The rest of the tenants will be announced closer to the mall’s opening date. About 3,000 full-time and part-time jobs will be created once the centre opens while there were about 4,500 jobs during peak construction.